How large the gap is

Water security in Ethiopia's capital is a supply problem and a losses problem at the same time. A 2022 policy brief from the REACH programme put maximum production at about 630,000 cubic metres a day, roughly 225,000 from surface sources and 404,000 from groundwater, against demand of more than one million cubic metres a day.

Estimates differ because demand itself is hard to measure when supply is rationed. JICA, Japan's aid agency, cited demand approaching 900,000 cubic metres a day in 2022 with about 511,000 distributed. Researchers quoted in 2024 put demand at 1.2 million cubic metres a day. Across those sources, the city meets something like half to two-thirds of its need.

Residents experience this as a timetable. A study reported in March 2024 found only seven woredas with water seven days a week, while most received water about twice a week. Households with tanks and private wells cope better than those without, so an intermittent supply also widens inequality. Across the country, the WHO and UNICEF monitoring report released in August 2025 counted 37 million people without basic water services.

Why it keeps growing

Growth is the main driver. JICA put Addis Ababa at 5.2 million people in 2022, rising about 4.4 per cent a year to around 7.3 million by 2030. Industry adds to the load: the REACH brief notes that more than 60 per cent of the country's industries sit in the Awash basin, in or near the capital.

The national picture follows the same pattern on a smaller scale. The State Minister of Urban and Infrastructure said in 2026 that Ethiopia has about 2,500 cities and towns, up from around 1,000 a decade ago. Many of them start with small utilities, limited storage and little in the way of sewerage.

Groundwater and reservoirs have limits

The quickest response has often been to drill. Groundwater supplies the larger share of Addis Ababa's water, and projects such as Legedadi Phase II were designed around well fields: 20 boreholes producing 86,000 cubic metres a day, with 15 reservoirs and 176 km of pipelines, according to 2019 reporting.

That route has limits. Researchers reported in 2024 that several deep wells in the Akaki-Kality area dried up between 2017 and 2019, and warned that heavy unregulated pumping threatens both quantity and quality. The REACH brief argues for managing surface water and groundwater together, and for monitoring groundwater far more closely.

Surface storage has its own constraints, including land, reservoir siltation and the energy needed to lift water to a high city. The Gerbi dam, funded by the city from its own budget after 2024 discussions, is designed to deliver more than 73,000 cubic metres a day at a cost of about 3 billion birr, over a construction period of three to four years. Useful as it is, a scheme of that size covers only a part of the gap, which shows why no single source can solve it.

Fixing losses is the fastest new source

JICA's 2025 evaluation of its work with the Addis Ababa Water and Sewerage Authority (AAWSA) put non-revenue water at about 40 per cent, with an estimated 70 per cent of that due to physical losses. AAWSA's goal is 20 per cent by 2030. On a system producing around 600,000 cubic metres a day, each point of reduction is worth about 6,000 cubic metres a day, so reaching that target could recover an amount comparable to a new dam, in places the city's pipes already reach.

The work is unglamorous and highly technical: dividing networks into metered blocks, finding leaks, replacing old mains, improving pressure management and fixing customer records. JICA's evaluation found that building the monitoring systems took longer than planned, partly because existing pipe network data was inaccurate. Good as-built records, then, are infrastructure too.

Finance is the other half of loss reduction. The same evaluation notes that about 80 per cent of AAWSA's capital spending over 11 years came from city subsidies and that tariffs have been low, while national policy calls for cost recovery. Utilities that collect enough to maintain their networks can protect the value of each new investment.

The sanitation half of the problem

More water in means more wastewater out, and sewerage has lagged behind supply. The World Bank's Second Urban Water Supply and Sanitation Project, covering Addis Ababa and secondary cities including Adama, Assela, Mekelle and Shashemene, reported in January 2025 that 73,030 cubic metres of wastewater a day was being safely treated, against an end-of-project target of 229,000, with 42,868 of a planned 57,600 sewer connections complete. The project is due to close in June 2027.

Treatment protects the sources that cities rely on. In a basin where shallow groundwater and reservoirs sit close to urban growth, untreated discharge eventually becomes tomorrow's supply problem.

What the infrastructure gap calls for

Four things have to move together: new sources sized for demand beyond 2030, transmission mains and reservoirs that even out supply, block-by-block rehabilitation of distribution networks, and sewers and treatment plants that keep pace. Secondary cities need the same set of works at a smaller scale, often with thinner engineering teams and greater need for simple, robust designs. Reliable electricity matters too, since pumping is what keeps well fields and high-level reservoirs working.

Water works are a part of our business, and we hold Grade One certification as a Water Works Construction General Contractor from the Ethiopian Construction Authority. Our work covers water supply, transmission, pumping stations and emergency schemes. What we have learnt in those jobs matches the evidence above: the pump, the pipe and the meter have to be planned as one system.