How a project runs

The same seven stages on every project, large or small.

From tender to handover and beyond

  1. Stage 01

    Tender and estimating

    Bill take-off, method statement, programme and risk register built before a price is submitted.

  2. Stage 02

    Award and mobilisation

    Contract review, insurance and bonds in place, site established, baseline programme issued within fourteen days.

  3. Stage 03

    Design and procurement

    Shop drawings, submittals and approvals ahead of the long lead. Nothing is ordered before it is approved.

  4. Stage 04

    Construction

    Weekly look-ahead, daily labour and plant returns, monthly valuation, inspection and test plans agreed before work starts.

  5. Stage 05

    Commissioning

    Systems tested, balanced and demonstrated to the client's engineer, with witness records.

  6. Stage 06

    Handover

    Joint inspection, written snag list, close-out certificate, as-built drawings and operation and maintenance manuals.

  7. Stage 07

    Defects liability

    A named contact for the full period, with agreed response times.

The cadence

14 daysTo baseline programme after award
WeeklyLook-ahead programme
DailyLabour and plant returns
MonthlyValuation and progress report