Gilgel Gibe II Hydroelectric Scheme

A second appointment for Ethiopian Electric Power, as prime contractor.
We are prime contractor for the employees' dwellings at the Gilgel Gibe II hydroelectric scheme. The work includes homes with their internal roads, drainage, water supply and electromechanical services.
We formed the platforms with our own plant, and batch concrete on site.




Employees' dwellings at a working hydroelectric scheme
The homes we are building at Gilgel Gibe II are for the scheme's employees. Rows of dwellings are going up across the site, with hills behind them, and crews finish the walls from timber scaffolds as the blocks rise.
This is a settlement as well as a set of houses, so roads, drainage, water supply and electromechanical services are built alongside the homes.
Site batching and platforms on a remote site
Concrete is batched on site at a plant we own, supplied with cement by bulk tanker. That keeps the pour programme in the hands of the team on the ground.
Our own plant formed the platforms before building began. Materials are tested before use, and work is inspected at defined stages before it is covered.
A repeat appointment for Ethiopian Electric Power
Ethiopian Electric Power also appointed us for the employees' dwelling houses and VIP houses at the Grand Ethiopian Renaissance Dam. At Gilgel Gibe II we are prime contractor, and the housing draws on what we have learned about building and supplying settlements at remote hydropower sites.
Next
Grand Ethiopian Renaissance Dam, VIP houses


