What water works contracting covers
Water works contracting covers everything between a source and the people who use it. That means abstraction and pumping, treatment, transmission and distribution pipework, the structures that house them, and the power that keeps them running.
Our own work ranges from national contracts for the Ministry of Water and Energy down to single emergency pumping stations. It also includes river works at Jimma for the Jimma Administrative Office, and water supply built into the settlements we construct at hydropower sites. We hold our water works certificate, reference WWCC/1/29250, alongside our Grade One certifications as a General Contractor and as an Electromechanical Contractor.
Why pumps and power belong in the same conversation
A borehole is only as useful as the pump in it, and a pump is only as reliable as the power behind it. Many water schemes need a generating set as well as a pump set, and treating those as separate purchases can leave a gap at the point where they meet.
That is why much of our water work combines the two. We have supplied submersible pump sets and generating sets to the Ministry of Water and Energy. For the Addis Ababa Housing Development Corporation we supplied, installed, tested and commissioned water pumps. Our electromechanical certification means the same company can answer for the civil work, the pump and the power supply.
Assembling and testing pump sets at Sendafa
Submersible and booster pump sets are assembled and tested at our works at Sendafa. Testing in a workshop is easier and cheaper than finding a fault at the bottom of a borehole or at a remote pumping station.
We also buy direct from manufacturers. We hold authorised agreements with WILO in Germany for pumps and pump systems, and with Shin Nan in Taiwan for ductile iron pipe and fittings. Ductile iron is widely used in water distribution for its strength and durability under pressure, and buying without an importer in between keeps the line from factory to site short.
Emergency water supply: the Wolkite Town scheme
Emergency schemes test a contractor differently. When a town needs water, the usual pace of mobilisation is not good enough, and the contractor has to have people, plant and materials it can call on immediately.
We delivered the Wolkite Town emergency water supply through the Bojebar pump station for the Ministry of Water and Energy. The certificate of appreciation signed by the State Minister records the work as delivered ahead of schedule and within the allocated budget.
Training the people who will run the system
A water system goes on working long after the contractor leaves, so handover has to include knowledge as well as equipment. On our submersible pump supply to the Ministry, technical support and training for Ministry staff on operation and maintenance were part of the job.
We apply the same thinking across our electromechanical work. Systems are tested, balanced and demonstrated to the client's engineer, with witness records, and operation and maintenance manuals go across at handover.
Water supply at camps and settlements
Not all our water work appears under a water contract. At the Grand Ethiopian Renaissance Dam and at Gilgel Gibe II, the employees' housing we build includes its own water supply along with internal roads, drainage and electromechanical services. At Bishoftu International Airport, water supply is part of our site establishment within the airport perimeter.
We have also worked on the information side of the sector, upgrading the Ministry's water, sanitation and hygiene management information system.
What to ask a water works contractor
If you are planning a scheme, ask to see the contractor's water works certificate and its electromechanical standing. Ask where pump sets are tested before they reach site, who supplies the pipe and fittings, and what training your operators will receive. Those answers tell you more about a scheme's future than a price does.